• English
    • Türkçe
  • English 
    • English
    • Türkçe
  • Login
View Item 
  •   DSpace Home
  • Akademik Arşiv / Institutional Repository
  • Lisansüstü Eğitim Enstitüsü / Graduate Education Institute
  • İş Sağlığı ve Güvenliği (Tezsiz - Türkçe) / Occupational Health and Safety (Non-Thesis - Turkish)
  • View Item
  •   DSpace Home
  • Akademik Arşiv / Institutional Repository
  • Lisansüstü Eğitim Enstitüsü / Graduate Education Institute
  • İş Sağlığı ve Güvenliği (Tezsiz - Türkçe) / Occupational Health and Safety (Non-Thesis - Turkish)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Control measure prioritization in Fine - Kinney-based risk assessment: a Bayesian BWM-Fuzzy VIKOR combined approach in an oil station

Thumbnail
View/Open
Control measure prioritization in Fine - Kinney-based risk assessment: a Bayesian BWM-Fuzzy VIKOR combined approach in an oil station (1.513Mb)
Date
2022
Author
Gül, Muhammet
Yücesan, Melih
Ak, Muhammet Fatih
Metadata
Show full item record
Abstract
The Fine - Kinney is a risk assessment method widely used in many industries due to its ease of use and quantitative risk evaluation. As in other methods, it is a method that recommends taking a series of control measures for operational safety. However, it is not always possible to implement control measures based on the determined priorities of the risks. It is considered that determining the priorities of these measures depends on many criteria such as applicability, functionality, performance, and integrity. Therefore, this study has studied the prioritization of control measures in Fine − Kinney-based risk assessment. The criteria affecting the prioritization of control measures are hierarchically structured, and the importance weights of the criteria are determined by the Bayesian Best–Worst Method (BBWM). The priorities of control measures were determined with the fuzzy VlseKriterijumska Optimizacija I Kompromisno Resenje (FVIKOR) method. The proposed model has been applied to the risk assessment process in a petrol station’s liquid fuel tank area. According to the results obtained with BBWM, the most important criterion affecting the prioritization of control measures is the applicability criterion. It has an importance weight of about 42%. It is followed by performance with 31%, functionality with 18%, and integrity with 10%, respectively. FVIKOR results show that the “Periodic control of the ventilation device” measure is the top priority for Fine − Kinney risk assessment. “The absence of any ducts or sewer pits that may cause gas accumulation in the tank area and near the dispenser; Yellow line marking of entry and exit and vehicle roads; Placing of speed limit warning signs” has been determined as a secondary priority. On conclusion, this proposed model is expected to bring a new perspective to the work of occupational health and safety analysts, since the priority suggested by Fine − Kinney risk analysis methods is not always in the same order as the one in the stage of taking action, and the source, budget, and cost/benefit ratio of the measure affect this situation in practice.
URI
http://hdl.handle.net/20.500.12566/1571
Collections
  • İş Sağlığı ve Güvenliği (Tezsiz - Türkçe) / Occupational Health and Safety (Non-Thesis - Turkish)

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV
 

 




sherpa/romeo


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsTypeABU AuthorWOSScopusPubMedTRDizinErişimThis CollectionBy Issue DateAuthorsTitlesSubjectsTypeABU AuthorWOSScopusPubMedTRDizinErişim

My Account

LoginRegister

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV
 

 


|| Library || Antalya Bilim Üniversitesi || OAI-PMH ||

Antalya Bilim Üniversitesi Kütüphane ve Dokümantasyon Müdürlüğü, Antalya, Turkey
İçerikte herhangi bir hata görürseniz, lütfen bildiriniz: acikerisim@antalya.edu.tr

DSpace Repository:


DSpace 6.4-SNAPSHOT

Gemini Bilgi Teknolojileri A.Ş tarafından destek verilmektedir.